Here's what's causing unplanned power outages in Regina
Regina and its immediate surrounding area has experienced more than 150 unplanned outages so far in 2022. The reasons for unplanned outages in the Queen City are a complicated issue, according to SaskPower.
“About a third of our unplanned outages are caused by weather events,” Joel Cherry, a spokesperson for SaskPower, told CTV News.
“About one third is caused by equipment failure, the other third is related to other natural factors such as trees coming into contact with lines, and wildlife [which] is a big one in Regina.”
According to Cherry, outages peak during the summer storm season and become more sporadic and isolated in the winter months.
“Obviously in the real world. You can't prevent 100 per cent of outages, because we are at the mercy of the elements to some degree,” he said.
This year’s unplanned outage count in the Regina area has totaled 159 so far. For the past two years, unplanned outages in and around the Queen City have consistently totalled over 200 annually.
Unplanned outages affecting 50 or more customers (Source: SaskPower)
- 2020 – 210 - 17.5 per month
- 2021 – 264 - 22 per month
- 2022 – 159 - 19.8 per month (Jan. to Aug.)
Aging infrastructure is an ongoing issue SaskPower is working on according to Cherry. Much of the effort is going into replacing equipment in the downtown area.
“In downtown Regina, we've been replacing underground infrastructure that has been there for quite some time,” he explained.
“This year alone, we're spending $8 million downtown, we're trying to replace underground cabling and ducting that’s come to the end of its life.”
Besides uncontrollable weather and equipment failure, wildlife and several other factors remain an issue for the provincial crown corporation.
“Wildlife is a big one here. We have a lot of squirrels, that sort of thing that can get into our equipment,” Cherry said.
“One of the things that we're doing is installing wildlife guards on our transformers to make that less likely to happen.”
As part of SaskPower’s 2022-23 “Infrastructure Sustainment Plan” $50 million has been allocated to repair and upgrade the power distribution across the province, with an additional $45 million being spent in Regina alone.
According to Cherry, SaskPower is also working to incorporate a battery storage system into the grid, to capture and store energy created by renewable means, such as solar and wind.
“These are all things that we're doing to try to make sure that we have a resilient system here.”
More information about the various causes of unplanned outages as well as a complete breakdown of SaskPower’s infrastructure sustainment plan can be found on its website.
CTVNews.ca Top Stories
BREAKING Alice Munro, Nobel literature winner revered as short story master, dead at 92
Nobel laureate Alice Munro, the Canadian literary giant who became one of the world's most esteemed contemporary authors and one of history's most honoured short story writers, has died at age 92.
Latest updates on air quality alerts, and when the smoke may reach Ontario and Quebec
Wildfires have led Environment Canada to issue air quality advisories for parts of B.C., Alberta, Manitoba, Saskatchewan and the Northwest Territories, as forecasters warn the smoke could drift farther east.
Are these Canada's best restaurants? Annual top 100 list revealed
The annual list of Canada's top restaurants in the country was just released and here are the places that made the 2024 cut.
Attack on prison van in France kills 2 officers, inmate escapes
Armed assailants killed two French prison officers and seriously wounded three others in an attack on a convoy in Normandy on Tuesday and an inmate escaped, officials said.
Maximum payout for LifeLabs class-action drops from $150 estimate to $7.86
Canadian LifeLabs customers who filed an application for a class-action settlement began receiving their payments this week, though at a much lower amount than initially expected.
Steal a car, lose your driver's licence for 10 years under new Ontario proposal
Repeat car thieves may face lengthy licence bans under proposed changes to Ontario’s Highway Traffic Act.
$1.6B parts plant for Honda electric vehicle batteries coming to Niagara Region
A Japanese company has announced it will build an approximately $1.6-billion plant in Ontario's Niagara Region that will make a key electric vehicle battery component as part of Honda's supply chain in the province.
B.C. brings in law on name changes on day that child killer's new identity revealed
The BC NDP have tabled legislation aimed at stopping people who have committed certain heinous acts from changing their names.
Manitoba premier to visit areas impacted by wildfire
Manitoba Premier Wab Kinew will get a close-up look at the devastation from a large wildfire burning in northern Manitoba Tuesday.